Connect International School | Fit Out

Year

2022

Timeline

8 months

Budget

$2 million

Size

N/a

V2R Group led the commercial fit-out of Connect International School, transforming an existing commercial space into a functional, modern educational environment designed to support students, staff, and day-to-day school operations.

The project required detailed coordination across architectural, mechanical, plumbing, electrical, and life safety scopes to ensure the space was not only functional, but also safe, compliant, and ready for occupancy.

Key Features

  • Interior demolition and space reconfiguration
  • New walls and partition systems
  • New universal barrier-free washroom
  • New kitchenette
  • New lighting and electrical layout
  • Strategic emergency lighting and exit signage
  • Interior finishing, including priming and painting
  • Flooring and finish upgrades
  • Architectural and interior detailing

 

Mechanical, Electrical & Plumbing Upgrades

  • Complete HVAC reconfiguration and modernization
  • Removal and replacement of existing climate-control equipment
  • Installation and relocation of high-efficiency heat pumps
  • Customized supply and return ductwork
  • Hydronic and condensate piping
  • Fire/smoke damper integration
  • New domestic hot and cold-water distribution
  • New sanitary drainage and vent piping
  • Electrical fit-out and device installations
  • Sprinkler and fire suppression modifications
  • Fire alarm and life safety upgrades

 

A major component of the project was coordinating these different systems within an existing commercial building while working around existing infrastructure and building conditions. V2R Group managed the various trades and construction requirements to ensure the mechanical, electrical, plumbing, architectural, and life safety components came together as one cohesive build.

The result is a fully transformed educational environment that combines functionality, safety, and thoughtful design to support Connect International School and the experience it provides to its students and staff.

Year

2024-2025

Timeline

9 Months 

Budget

$1.1 Million

Size

5627 sq. Ft.  

“When we take on a project, we take ownership of every detail, from coordination and construction to the final finish.”

Jesse Payne

General Manager